O'brien Atkins
  • Portfolio
  • People
  • About
  • Integrated Design
  • News
  • Contact

Category: Electrical Engineering

New Durham Tech Applied Tech Building to Open on Main Campus early 2021

Posted on June 22, 2020June 22, 2020 by Pat Perkins

https://www.durhamtech.edu/news/new-applied-technology-building-open-main-campus-early-2021

O'brien Atkins

919.941.9000

Mailing:

PO Box 12037, Research Triangle Park, NC 27709

Street:

5001 Miami Blvd, Suite 400, Durham NC 27703

MENU
  • Home
  • Portfolio
  • People
  • About
  • Integrated Design
  • News
  • Contact